Project Status Tracking and Reporting Tool
  • Status Reporting
  • KPI Radar
  • Strategic Foresight
  • Pricing
  • Resources
    • Blog
    • Product release
    • White Paper
    • Help Center

Contact us

Try it free
Project Status Tracking and Reporting Tool
  • Status Reporting
  • KPI Radar
  • Strategic Foresight
  • Pricing
  • About us
  • Resources
    • Blog
    • Product Release
    • White Paper
    • Help Center
  • Join Radar Team
  • Contact us
  • Try it free

Help Center

Quick Start

4
  • Radar overview
  • How to create a workspace?
  • How to set a workspace name?
  • What access levels / user roles are there?

Account Settings

4
  • How can I change the email address associated with my account?
  • How to reset my password?
  • How can I manage email notifications?
  • How can I delete my account?

Billing and Subscriptions

5
  • Where can I find information about the end date of my subscription?
  • How can I find out if I have reached my project limit in my workspace?
  • How can I know if my subscription has expired?
  • Where can I find information about my payments?
  • What payment options are available?

Fields and Configuration

4
  • What is a field? 
  • How to create a field
  • Field actions
  • Templates

Projects

8
  • How can I filter project data?
  • How to manage project-level permissions?
  • How to export the project list and project data?
  • How to add a project manually?
  • Everything on project connections
  • How to add a project by importing data from Excel?
  • How to add a project by importing data from Jira?
  • How to edit a project?

Views

5
  • What views are available?
  • How to create a view
  • How to share a view
  • How to copy a view?
  • How to delete a view?

Customization

3
  • Can I customize the Radar view?
  • Can I customize the tenant’s logo?
  • Can I change the preview image on the login screen?

Users

5
  • Invite new users to your workspace
  • How to edit a user
  • How to deactivate and delete users
  • Roles and permissions
  • How to create a user group

Status Reporting

2
  • Project status reporting
  • How to schedule and automate report releases?

Strategic Foresight

9
  • What is strategic foresight?
  • How to enable voting?
  • How to add voting results to a view?
  • How to estimate project parameters with a community?
  • How to view project parameters estimation results?
  • How to switch on iterating through signals using wizard?
  • How to make a view accessible to all workspace users?
  • How to share the common registration link?
  • How to participate in strategic foresight?

Chats and Notifications

2
  • How to use chats in Radar?
  • How to use notifications in Radar?
  • Home
  • Help center
  • Strategic Foresight
  • How to estimate project parameters with a community?
View Categories

How to estimate project parameters with a community?

To enable sliders for project (signal) parameter estimation, you’ll first need to create “Ranking” fields for each parameter:

Step 1: Create Ranking Fields
1. Open Field Configuration.

2. Click to add a new field.

3. Choose “Ranking” as the field type.

4. Add the options that will be used as a scale on the slider.

5. Save the newly created field.

Repeat these steps for each parameter that you want the community to estimate.

Step 2: Add Ranking Fields to a Signal Report

Once you’ve created the necessary fields, follow these steps to add them to a signal report:

1. Select the view that will be used for project parameter estimation.

2. Click on the “Edit” menu item.

3. Navigate to the “Report layout” section.

4. Find the tiles with the “Ranking” fields in the list on the left and drag them to the desired position in the report layout on the right.

5. Save the changes to the layout.

Using the Sliders

The sliders will now be displayed in the selected position within the report.

– Grey Slider Handle:
Indicates that the user hasn’t yet estimated the parameter. Once a parameter is estimated, the user can reset their estimation by clicking the “Reset” button in the corner.

– Anonymous Estimations:
User estimations are anonymous and visible only to the user. Estimations made by others do not influence an individual’s estimates. Estimations can be displayed across multiple views and will retain their values.
Resetting Estimations as an Administrator

Administrators can reset all user estimations for a specific field:

1. Go to the Field Configuration menu.

2. Locate the “Ranking” field that you wish to reset.

3. Click the “Reset” button to clear all estimations.

For more information on displaying the results of signal parameter estimations, see How to View Project Parameters Estimation Results?

How to add voting results to a view?How to view project parameters estimation results?
Projects Radar logo
  • Follow
  • Follow
  • Follow
  • Follow
  • Follow

PRODUCT

Status Reporting

KPI Radar

Strategic Foresight

Pricing

COMPANY

About us

Career

Contact us

RESOURCES

Blog

Product release

White paper

Help center

©2025. All Rights Reserved GET Information Technology GmbH | Rudolf-Diesel-Strasse 14, 41516 Grevenbroich, Germany

Terms of service      Privacy policy       Legal notice