---
title: How to view project parameters estimation results?
description: "Prerequisite: At least one project parameter must be added for community estimation. *([How to estimate project parameters with a community?](/hc/strategic-foresight/how-to-estimate-project-parameters-with-a-community))* To display the results of project (signal) parameter estimations, follow these steps: **1. Select a View:** Choose the view where…"
url: "https://projects-radar.com/hc/strategic-foresight/how-to-view-project-parameters-estimation-results/"
updated: "2024-10-18"
category: Strategic Foresight
---

# How to view project parameters estimation results?

Prerequisite: At least one project parameter must be added for community estimation. *([How to estimate project parameters with a community?](/hc/strategic-foresight/how-to-estimate-project-parameters-with-a-community))*

To display the results of project (signal) parameter estimations, follow these steps:

 **1. Select a View:** Choose the view where you want to display the results of the project parameter estimations. **2. Enter Edit Mode:** Click on the "Edit" menu item.  ![](https://projects-radar.com/wp-content/uploads/2-1.png)

**3. Open the Charts Menu:**
Navigate to the "Charts" section.

  ![](https://projects-radar.com/wp-content/uploads/4-1.png)  **4. Enable General Ranking:** Find the "General Ranking" section on the right and toggle the switch to "on."  ![](https://projects-radar.com/wp-content/uploads/4-2.png)

**5. Select Parameters:**
Choose which parameters to display in the report and assign default values for the X and Y axes.

  ![](https://projects-radar.com/wp-content/uploads/image-14.png)

**6. Save Settings:**
Save the changes to apply the configuration.

Once enabled, a new data visualization labeled "General Ranking" will appear on the left panel.

  ![](https://projects-radar.com/wp-content/uploads/4-3.png)

##### Understanding the Visualization

The "General Ranking" visualization displays a portfolio chart that reflects the average values of all estimated parameters provided by community users.

**- Displayed Signals:**
Only signals with at least one estimation of the parameters corresponding to the X and Y axes will be shown on the chart.

**- Viewing Details in the General Ranking Panel**

By opening the "General Ranking" panel, you can explore the distribution of project parameter estimations made by the community:

  ![](https://projects-radar.com/wp-content/uploads/image-17.png)

**- Select X and Y Axes:**
Use the dropdowns at the top to choose which parameters to display on the X and Y axes. This will update the chart to show the corresponding projects.

**- Sorting Options:**
You can sort the projects by average estimation, either in ascending or descending order.

**- Chart Elements:**

- The **long dashed line** represents the overall average value.

- The **short lines** correspond to individual community members' estimations.

- The **black line** shows the estimation of the current user, allowing for easy comparison with the community’s input.

  ![](https://projects-radar.com/wp-content/uploads/Legend-1-EN-2.svg)

This visualization provides a clear, comparative view of how different signals are rated based on the selected parameters.

For more information on adding project parameters for estimation, refer to this [article](/hc/strategic-foresight/how-to-estimate-project-parameters-with-a-community).
